FRAME & HEADER KITINSTRUCTIONSKeston Heat 45Keston Heat 55Keston HeatingPO Box 103, National Avenue, Kingston Upon Hull, HU5 4JNTel. +44 (0) 1482
10Keston Heat - Frame & Header Kits4.2.3 INSTALLATION DRAWING WITH 4 - 45 or 55 BOILERS (SIDE BY SIDE)Side by side wall or frame mounting dimensi
11Keston Heat - Frame & Header Kits 4.2.4 INSTALLATION DRAWING WITH 5 - 45 or 55 BOILERS (SIDE BY SIDE)Side by side wall or frame mounting dimen
12Keston Heat - Frame & Header Kits4.2.5 INSTALLATION DRAWING WITH 6 - 45 or 55 BOILERS (SIDE BY SIDE)Side by side wall or frame mounting dimensi
13Keston Heat - Frame & Header Kits5 WALL MOUNTED INSTALLATION PROCEDURE5.1 WALL MOUNTED SIDE BY SIDE OPTIONEnsure wall is capable of supporting
14Keston Heat - Frame & Header Kits5.1 WALL MOUNTED SIDE BY SIDE OPTION CONT'D...PLAN VIEWSIDE VIEWCareful consideration MUST be gi
15Keston Heat - Frame & Header Kits6 FRAME KIT INSTALLATION PROCEDURE6.1 SIDE BY SIDE FRAME KIT MOUNTING PROCEDURE1. Place the frame kit sectio
16Keston Heat - Frame & Header Kits6.2 BOILER MOUNTING7 HEADER KIT ASSEMBLY7.1 FITTING MIXING HEADER AND BLANKING FLANGES1. Fit the mixing head
17Keston Heat - Frame & Header Kits7.2 FITTING HEADER KIT ASSEMBLY2. Screw the header legs to the frame feet with the bolts, nuts & washers
18Keston Heat - Frame & Header Kits1227.3 FITTING GAS CONNECTION1. Fit the gas isolation valve assembly supplied with the boiler to the boiler g
19Keston Heat - Frame & Header Kits8 ELECTRICAL CONNECTIONS9 COMMISSIONING AND TESTINGRefer to the Installer Wiring Connection section in the bo
2Keston Heat - Frame & Header KitsCONTENTS1 Introduction and General Description ...32 General Description of Cascade Syste
June 2013 UIN 209785 A01Keston pursues a policy of continuing improvement in the design and performance of its products. The right is therefore
3Keston Heat - Frame & Header Kits1 INTRODUCTIONThis technical data contains information for dimensioning & assembly of a cascade system kit f
4Keston Heat - Frame & Header Kits Total Output Required KwSide By Side Option – Number Of Boilers/Output RequiredSide by Side Footprint SizeW x D
5Keston Heat - Frame & Header Kits2.2 MULTIPLE BOILER INSTALLATIONS For installing 2 to 6 boilers, the product range includes water and gas heade
6Keston Heat - Frame & Header Kits3.3 GAS HEADERThe Gas header consists of a custom manufactured 2” manifold. This is located in a cradle incorp
7Keston Heat - Frame & Header KitsIMPORTANT POINTSBefore commencing installation:If Wall mounting; • Ensure wall is capable of supporting the wei
8Keston Heat - Frame & Header Kits4 INSTALLATION DRAWINGS FOR MULTIPLE BOILER SYSTEMS4.1 GENERALThe multiple boiler systems are available in two
9Keston Heat - Frame & Header Kits 4.2.2 INSTALLATION DRAWING WITH 3 - 45 or 55 BOILERS (SIDE BY SIDE)Side by side wall or frame mounting dimens
Comments to this Manuals