2. BOILER LOCATION
2.1 DIMENSIONS AND MINIMUM
CLEARANCES
The boiler must be installed in
minimum clearances shown to
allow subsequent servicing, and
safe operation. However, larger
clearances may be required
during installation.
2.2 SERVICE CONNECTIONS
Gas, water, air and flue pipe,
condensation, and electrical
connections are as shown. Gas :
0.5 inch BSP female. Flow/Return
0.75 inch BSP female.
An optional stand-off frame is
also available which mounts
behind the boiler to leave a
50mm deep space behind the
boiler. This is to permit pipe
routing behind the boiler if
required. See Section 1.5 -
Optional Accessories.
2.3 POSITION
The Celsius 25 is not suitable for
external installation. The boiler
may be installed in any room or
internal space, although
particular attention is drawn to
the requirements of the current
IEE Wiring Regulations and, in
Scotland, the electrical
provisions of the Building
Regulations applicable in
WD209/1/2000 Chapter 2 - Boiler Connections The Keston Celsius 25 & 25P
Installation & Servicing Instructions Page : 5
All dimensions in mm.
150
305 (W hen servicing appliance )
100
Figure 2.1.1
Minimum Clearances
1
1
10 (W hen appliance is operating )
All dimensions in mm.
471
2
4
9
Figure 2.1.2
Dimensions
Air Intake
Flue
621
in mm
Base View
Service Connection Locations All dimensions are in mm.
162
408
Top View
34
34
21
270
210
140
27
40
25
Elec
Return
Flow
Condense
Gas
Air
Flue