INSTALLATION
Keston Combi - Installation and Servicing
FLUE OUTLET
8
FLUE SYSTEM
IMPORTANT
When installing a replacement boiler a new ue system must be used. DO NOT re-use the existing boiler
ue installation.
DESIGN
Individual air supply and ue outlet pipes are used as standard.
The material approved for this application is which MUST be used is:
Marley muPVC Solvent Weld System (50mm) and Polypipe System 2000 muPVC solvent weld
(50mm), to BS5255 and/or BSEN1566-11 and BSEN1329, are the only systems approved for this
application.
Thefollowingpipeandttingsareapproved.
Polypipe System 2000 muPVC solvent Weld System (50mm)
Poly Pipe Code
MU 301 4m length muPVC wastepipe 5/225
MU 313 50mm x 45 deg muPVC obtuse bend
MU 314 50mm x 92.5 deg muPVC swept bend
MU 310 50mm muPVC straigh coupling
MU 316 50mm x 92.5 deg muPVC swept pipe
Marley muPVC Solvent Weld System (50mm)
Marley Code
KP 304 50mm x 4m double spigot pipe
KP32 50mm x 45 deg bend
KSC3 50mm straight coupling
KB3 50mm x 88.5 deg bend
KT3 50mm swept tee
Consideration MUST be given to expansion and contraction of the ue. Refer to Assembly Practice Frame in this installation and
Servicing Instructions for further guidance.
continued............